75% Design Meeting at CDM in Maitland Florida 09/06/07 |

75% Design Meeting at CDM in Maitland Florida 09/06/07 |

Aerial View of RIBs Construction 08/30/07 |

Aerial View of RIBs Construction 08/30/07 |

Aerial View of Reclaimed Water Holding Ponds 08/30/07 |

Aerial View of Early Site Work for the Arbennie Pritchett WRF 08/30/07 |

Aerial View of the Arbennie Pritchett WRF Project Site 08/30/07 |

Map of Sites for Surface Water Monitoring Required for Operation of the Arbennie Pritchett WRF (click for PDF) |

Field Biologist with Biological Research Associates taking water quality readings at Surface Water Monitoring Site SW-02 Lightwood Knot Creek 08/30/07 |

Field Biologist with Biological Research Associates taking water quality samples at Surface Water Monitoring Site SW-02 Lightwood Knot Creek 08/30/07 |

Field Biologist with Biological Research Associates taking biological samples for the Stream Condition (SCI) Index Baseline at Surface Water Monitoring Site SW-02 Lightwood Knot Creek 08/30/07 |

Field Biologist with Biological Research Associates scouts Surface Water Monitoring Site SW-02 Lightwood Knot Creek 08/30/07 |

Field Biologist with Biological Research Associates taking measurements of area for the Stream Condition (SCI) Index Baseline at Surface Water Monitoring Site SW-02 Lightwood Knot Creek 08/30/07 |

Surface Water Monitoring Station SW-3 Lightwood Knot Creek 08/31/07 |

Jim Kizer of TCG address design issue during 30% design meeting. Garniers Re-Pumping Station. |

David Kozan and Charlie Voss of CDM present 60% Design Drawing. |

Jim Kizer of TCG addresses design issue during the 60% design meeting with CDM |

County Dozer and Operator outfitted with GPS Controls for precision grading of RIBs |

Harold Godwin and Jebb Chesser overseeing construction of the RIBs for Okaloosa Water and Sewer |

County pipe fitters installing pipe for the RIBs |

CDM off and running with the early site work for the Arbennie WRF. |

CDM under construction as of August 27, 2007 |

Construction of the Arbennie Pritchett WRF is now officially underway. 08/27/07 |

OCWS RIBs Construction August 24, 2007 |

Foundation Preparation for Reclaimed Water Valve Box. August 15, 2007 |

Valve Box Installation by OCWS Crew. August 15, 2007 |

Reclaimed Water Valve Box Installation by OCWS Crew. August 15, 2007 |

New Power Line Easement for the Arbennie Pritchett WRF. August 10, 2007 |

Power to the Arbennie Pritchett WRF Construction Offices August 10, 2007 |

Entrance Road for the Arbennie Pritchett WRF Under Construction. August 10, 2007 |

Okaloosa County W&S Pipe Fitters Install Reclaimed Water Distribution Line for RIBs. August 10, 2007 |

Reclaimed Water Distribution Line for the RIBs. August 10, 2007 |

Construction Offices for the Arbennie Pritchett WRF Project Arrive August 3, 2007 |

Reclaimed Water Valve Box RIBs Project August 3, 2007 |

Reclaimed Water Valve Box RIBs Project August 3, 2007 |

30-Inch Reclaimed Water Main and Valve Box Installation August 3, 2007 |

30-Inch Reclaimed Water Main and Valve Box Installation August 3, 2007 |

The entrance road to the new Arbennie Pritchett WRF under construction. August 3, 2007 |

The entrance road to the new Arbennie Pritchett WRF under construction August 3, 2007 |

TCG lays out possible route for 36” Raw Sewage Forcemain to the New Arbennie WRF 08/02/07 |

OCWS grading for the new entrance road to the Arbennie Pritchett WRF 08/02/07 |

30-Inch Ductile Iron Reclaimed Water Main to be installed for the RIBs June 22, 2007 |

RIBs Construction June 21, 2007 |
|