Interior of Inner Digester Ring 10/31/07 |

Looking Up from inside the Inner Digester Ring 10/31/07 |

Excavation for the Clarifier Center Pier 10/31/07 |

Reinforcing Steel for the Clarifier Center Pier 10/31/07 |

Construction beginning to spread out 10/30/07 |

Sub-grade Preparation for Clarifier 10/30/07 |

OCWS Crews Install a 48” Storm Drain. 10/25/2007 |

Pre-stressed Digester Tank Construction.10/25/2007 |

Applying “gunnite” to pre-stressed digester tank wall. 10/25/2007 |

Pre-stressed Digester Tank Construction.10/25/2007 |

Pre-stressed Digester Tank Construction.10/25/2007 |

Pre-stressed Digester Tank Construction.10/25/2007 |

Applying “gunnite” to pre-stressed digester tank wall. 10/25/2007 |

Applying “gunnite” to pre-stressed digester tank wall. 10/25/2007 |

Clearing the line. Pre-stressed digester construction 10/25/2007 |

Clearing the line. Pre-stressed digester construction 10/25/2007 |

Clearing the line. Pre-stressed digester construction 10/25/2007 |

Concrete to the “gunnite pump. Pre-stressed digester construction 10/25/2007 |

Concrete Lab Tech Performing a Slump Test. Concrete Quality Control. Pre-stressed digester construction 10/25/2007. |

OCWS Crews Installing Reclaimed Water Distribution Piping for RIBs 10/25/2007 |

Reclaimed Water Distribution Piping for RIBs 10/25/2007 |
|

Pre-Stressed Tank Construction. Digester 10/25/07 |

Spray Application of concrete “Shotcrete.” Digester 10/25/2007 |

Concrete spray application. Digester 12/25/2007 |

Trimming the excess shotcrete. Digester 10/25/2007 |

The steel is set and ready for concrete. Digester foundation 10/15/07 |

A long reach for the concrete pump. Digester foundation 10/15/2007 |

Pumping concrete. Digester foundation 10/15/2007 |

Spreading concrete. Digester foundation 10/15/2007 |

Consolidating concrete. Digester foundation |

A workman’s comp claim? |

Keep the concrete coming! Digester foundation 10/15/2007 |

The “A” Team! 10/15/2007 |

Concrete quality control. Concrete Lab Tech Preparing an air test on the concrete. Digester Foundation 10/15/2007 |

Concrete quality control. Concrete Lab Tech performing an air entrainment test on concrete. Digester Foundation 10/15/2007 |

Finishing concrete. Digester Foundation |

Curing Concrete. Scaffolding to construct wall forms. Digester 10/15/2007 |

Aerial View of RIBs Construction 09/28/07 |

Aerial View of RIBs Construction 09/25/07 |

Aerial View of RIBS Construction 09/25/07 |

Site Work 9/14/07 |

Testing Lab Preparing for a Compaction Test for Digester Foundation Subgrade 09/14/07 |

Testing Lab Performing Compaction Tests 09/14/07 |