Pre-Stressed Tendons Around Digester Inner Ring Wall |

Pre-Stressing Tendons around Digester Inner Ring Wall |

Pre-Stressing Tendons Around Digester Inner Ring Wall |

Pre-Stressing Tendons Around Digester Inner Ring Wall |

Monitoring Tension in Tendons |

Vapor Barrier and Form for Clarifier # 1 Base Slab |

Encased Influent Line and Center Pier for Clarifier #2 |

Restoring Grade for Clarifier # 2 |

Applied Shotcrete to Oxidation Ditch # 1 E Wall |

Vapor Barrier and Form for Clarifier #1 Base Slab |

Preparing Rebar for Clarifer #1 Base Slab |

Applying Shotcrete to Oxidation Ditch #1 E Wall |

Tensioning Tendons |

Tensioning Tendons for Digester Inner Ring Wall |

Preparing Subgrade for Clarifier #1 |

Compacting Subgrade for Clarifier #1 |

Pressure Relief Valves for Clarifier #1 Base |

Wrapping Tendons |

A View of Clarifiers #1 & 2 and Oxidation Ditches # 1 & 2 |

Installed Rebar and Water Stop for Clarifier # 1 |

Installed Rebar for Clarifier # 1 |

Water Stop and Rebar for Clarifier # 1 |

Form Work for Clarifier #2 Base Slab |

Tendons Spliced at Digester Inner Ring Wall Base |

Aerial View of Arbennie Pritchett WRF 11/30/07 |
|

I Can’t Believe I Ate the Whole Thing |

Happy Birthday Jeff O |
 |
 |

Preparing Sub-grade for Clarifier #1 |

Restoring Grade for Clarifier #2 |

Pre-stressing Inner Digester Ring Wall |
|

OCWS Crews Wrestling Pipe |

OCWS Crews Laying Pipe |

Preparing Sub-grade for Clarifier #1 |

Restoring Grade for Clarifier #2 |

Preparing Clarifier #2 Influent Line for Pressure Test |

Pressure Testing Apparatus |

Pressure Test of Influent Line for Clarifier # 2 |

Wall for Oxidation Ditch # 1 |

Base of Wall for Oxidation Ditch #1 |

Wall of Oxidation Ditch # 1 |

8” Drain line for Oxidation Ditch # 1 |
Restoring Grade for Clarifier #2 |

Concrete Placed in Base of Oxidation Ditch Wall |

Restoring Grade |

Restoring Grade |

Restoring Grade Around Influent Line and Center Pier for Clarifier |

Restoring Grade Around Clarifier Influent Line and Center Pier |

Reinforcement for Base of Oxidation Ditch Wall |

Reinforcement for Base of Oxidation Ditch Wall |

Preparing Reinforcement of Base of Oxidation Ditch Wall |

Stormwater Detention Basin |

Pressure Testing Clarifier Influent Lin |

Center Pier for Clarifier |

Restoring Grade Beneath Clarifier.
Workers Compacting with Vibratory Compactors |

Clarifier Center Pier and Concrete Encasement for Influent Line |
|