Wall Forms for Oxidation Ditch Construction with Water Stops Installed |

Wall Forms for Oxidation Ditch Construction |

Cap on 42” Clarifier Pipe for Pressure Test |

Preparing Concrete Encasement of Clarifier Influent Pipe |

Digester Wall Penetration |

Preparing Clarifier Influent Pipe for Pressure Test |

Digester Wall Penetration |

Sub-grade for Oxidation Ditch Footing |

Installation of Clarifier Influent Pipe |
Clarifier Influent Pipe |

Looking North from South End of Site |

Erecting the Scaffolding for Oxidation Ditch Construction |

Installation of Water Stop for Oxidation Ditch |

Clarifier Influent Pipe |

Scaffolding for Oxidation Ditch Construction |

Scaffolding for Oxidation Ditch Wall Construction |

Clarifier Influent Pipe and Center Pier |

Footing for Oxidation Ditch |

Construction of Oxidation Ditch Footing |

Subgrade Preparation for Clarifier Center Pier and Influent Pipe Support |

OCWS Construction Crews making a 24” to 14” tie in for the reclaimed water distribution system |

A Double Ring Infiltrometer Test for Quality Control of RIBs Construction |

Infiltrometer Test for Quality Control of RIBs Construction |

Soils Tech from Jacobs and Associates Preparing the Double Ring Infiltrometer Test for Quality Control of the RIBs Construction |

OCWS Construction Crews going down line with the 30” reclaimed water distribution line. |

Preparing Subgrade for Clarifier center pier and influent Pipe Support |

Preparing Subgrade for Clarifier center pier and influent Pipe Support |

Placing concrete for clarifier center pier and influent pipe support |

OCWS Construction Crews making a bend in the 30” reclaimed water distribution line |

Placing concrete for clarifier center pier and influent pipe support |

OCWS Construction Crews making a bend in the 30” reclaimed water distribution line |

Dee keeps ’em moving 11/09/07 |

Preparing the Sub-grade for the Oxidation Ditch Foundation 11/09/07 |

The Laser Keeps Things “on the Level” 11/09/07 |

Checking the Grade 11/09/07 |

Checking the Elevation of the Sub-grade Using the Laser and Rod 11/09/07 |

The Clarifier Center Pier and Influent Pipe Support 11/09/07 |

Preparing the Sub-grade for the Western Oxidation Ditch 11/09/07 |

Looking North West Access the Stormwater Detention Basin at the Digester 11/01/07 |

Looking North Across the Stormwater Detention Basin 11/01/07 |