Scaffolding for Oxidation Ditch # Exterior Wall |

Diaphragm and reinforcing steel for Wall of Clarifier # 1 |

Diaphragm and reinforcing steel for Wall of Clarifier # 1 |

Laying Vapor Barrier for Oxidation Ditch #1 |

View of Site from South East Corner |

Applying Shotcrete to Wall of Clarifier #1 |

Applying Shotcrete to Wall of Clarifier #1 |

Prepping Clarifier #1 for Shotcrete Application |

Clarifier # 1 Ready for First Application of Shotcrete |

Vapor Barrier and Reinforcing Steel for Slab of Oxidation Ditch #1 |

Vapor Barrier and Reinforcing Steel for Slab of Oxidation Ditch #1 |

Vapor Barrier and Reinforcing Steel for Slab of Oxidation Ditch #1 |

Application of Shotcrete for Clarifier #1 |

Catch Basin for Stormwater Drainage |

OCWS Crews Installing Reclaimed Water Distribution Line. |

Valve Box for RIBs Reclaimed Water Distribution Line Installed by OCWS Crews. |

Diaphram for Clarifier #1 |

Diaphram for Clarifier #1 |

Diaphram for Clarifier #1 |

View Between Clarifier #1 and #2 |

Diaphram for Clarifier # 2 |

View of Site from West of Oxidation Ditches |

OCWS Construction Crews Installing Reclaimed Water Distribution Piping for RIBS |

Staging of Reclaimed Water Distribution Pipe for RIB Construction |

Scaffolding for Construction of Pre-stressed Wall for Clarifier #1 |

Scaffolding for Construction of Pre-Stressed Wall for Clarifier #2 |

West Wall for Oxidation Ditch #2 |

West Wall for Oxidation Ditch #1 |

Preparing Sub-grade for Oxidation #1 |

Wind Damaged Diaphragm and Scaffolding for Oxidation Ditch #2 |

Wind Damaged Diaphragm and Scaffolding for Oxidation Ditch #2 |

Rebar in place for Clarifier #1 |

Rebar in place for Clarifier #1 |

Rebar in place for Clarifier #1 |

Securing water stop in Clarifier #2 |

Securing water stop in Clarifier #2 |

Form and Rebar for Base slab for Clarifier # 1 ready for concrete. |

Constantine Engineering inspects drainline for Oxidation Ditch #1 |

Placement of concrete for Clarifier #2 |

Placement of concrete for Clarifier #2 |

Placement of concrete for Clarifier #2 |

Erosion control at the stormwater treatment basin. |

Placement of concrete for Clarifier # 1 |

Placement of concrete for Clarifier # 1 |

Placement of concrete for Clarifier #1 |