Forms for Maintenance Building Footings |

Drains for Administration Building |

Administration Building Subgrade |

Form, vapor Barrier for Base Slab for Oxidation Ditch # 2 |

Form, vapor Barrier for Base Slab for Oxidation Ditch # 2 |

Form, vapor Barrier for Base Slab for Oxidation Ditch # 2 |

Form, vapor Barrier for Base Slab for Oxidation Ditch # 1 |

Final Coat of Shotcrete Being Applied to Digester Exterior Wall |

Final Coat of Shotcrete Being Applied to Digester Exterior Wall |

Preparing the Sub-grade for the Administration Building |

Fusing Pipe for the Lab in the Administration Building |

Fusing Pipe for the Lab in the Administration Building |

Preparing Form and Rebar for Base Slab for Oxidation Ditch #1 |

Preparing Form and Rebar for Base Slab for Oxidation Ditch #1 Setting the rubber water stop. |

Inspecting the weld connection of the rubber water stop, Oxidation Ditch #1 |

Tying the Wall and Base Slab Together for Oxidation Ditch #1 |

Setting the Rubber Water Stop for Oxidation Ditch #1 |

Preparing Form and Rebar for Base Slab for Oxidation Ditch #1 |

Preparing Form and Rebar for Base Slab for Oxidation Ditch #1 |

Preparation for the Cap, Clarifier #2 |

The Last Segment of Underground Piping for the RIBS |

Forms, Rebar, and Water Stop Ready for Concrete Oxidation Ditch #1 |

Forms, Rebar, and Water Stop Ready for Concrete Oxidation Ditch #1 |

Preparing the Forms and Rebar for Oxidation Ditch #2 |

Preparing the Forms and Rebar for Oxidation Ditch #2 |

Setting the Water Stop for Oxidation Ditch #1 |

Setting the Water Stop for Oxidation Ditch #1 |

View of Site from the Stormwater Detention Basin. |

Application of Exterior Coat of Shotcrete to Clarifier #1 |

Application of Exterior Coat of Shotcrete to Clarifier #1 |

Application of Exterior Coat of Shotcrete to Clarifier #1 |

Application of Exterior Coat of Shotcrete to Clarifier #1 |

Application of Exterior Coat of Shotcrete to Clarifier #1 |

Setting Rebar for Oxidation Ditch # 1 Base Slab |

Setting Rebar for Oxidation Ditch # 1 Base Slab |

Setting Rebar for Oxidation Ditch # 1 Base Slab |

Setting Rebar for Oxidation Ditch # 1 Base Slab |

Setting Rebar for Oxidation Ditch # 1 Base Slab |

Setting Rebar for Oxidation Ditch # 1 Base Slab |

Setting Rebar for Oxidation Ditch # 1 Base Slab |

Finishing of Exterior Shotcrete Clarifier # 1 |

Perimeter Footing for Maintenance Building |

Setting Electrical Conduit for Administration Building |

Setting Electrical Conduit for Administration Building |

Setting Electrical Conduit for Administration Building |

Contractors Row |

Pre-stressing Clarifier #2 |

Pre-stressing Clarifier #2 |

Concrete Truck and Concrete Pump applying shotcrete Exterior of Clarifier #1 |

Applying Mastic to Floor of Launder in Clarifier #1 |

Workmen Finishing Launder for Clarifier #1 |

Applying Grout to Launder of Clarifier #1 |

Finishing Launder for Clarifier #1 |

Setting Rebar for Oxidation Ditch #1 Base Slab |

Setting Rebar for Oxidation Ditch #2 Base Slab |

Reclaimed Water Application to a RIB |

Reclaimed Water Application to a RIB |

Riser Pipe and Concrete Splash Pad in a RIB |

View of Digester from Site Entrance |

View of Digester. Preparing to Pre-stress exterior wall. |

Setup for Pre-stressing of Digester Exterior Wall |

Clarifiers #1 and #2. Pre-stress of Clarifier #1 in progress. |

Application of Shotcrete to Clarifier #2 |

Steve Solters of CDM Directing Traffic On-site |

Setup for Pre-stressing of Clarifier #1 |

Setting Vapor Barrier and Rebar for slab and interior wall of Oxidation Ditch #1 |

Setting Grade for Northern Section of Oxidation Ditch #1 |

42” Influent Pipe for Oxidation Ditch #1 |

Setting Vapor Barrier and Rebar for Base Slab and Interior Wall of Oxidation Ditch #2 |

Vapor Barrier and Rebar for Base Slab and Interior Wall of Oxidation Ditch #1 |

Space Between Oxidation Ditches |

Compacting Backfill Adjacent to 42” Influent Line |

Compacting Backfill Adjacent to 42” Influent Line to Oxidation Ditch #2 |

Vapor Barrier and Rebar for Base Slab and Interior Wall of Oxidation Ditch #1 |

Panoramic View of the Project Site |

View of Clarifiers |

Pre-stressing Wall for Clarifier #2 |

Pre-stressed tendons for Clarifier #2 |

Compacting Sub-grade for Oxidation Ditch # 2 |

Laying out the end section of an Oxidation Ditch |

Baffles for the Clarifiers |

Sluice Gates for Digester |

Sluice Gate for Digester |

Pre-stressed Tendons Around Clarifier Wall |

Hand Excavation for Electrical Conduit Gallery |

Drain Line for Oxidation Ditch |

42” RAS/WAS Line |

42” RAS/WAS Line |

42” RAS/WAS Line |

42” RAS/WAS Line |

Installing Riser Pipe for a RIB |

OCWS Crew Positions Riser Pipe for RIB |

OCWS Crew Pressure Tests Valve for RIBs Reclaimed Water Distribution System |
|