Forms and RE-bar for Ultraviolet Disinfection Chamber Foundation |

Excavation for Effluent Pump Station |

Forms and Re-bard for Maintenance Building Foundation |

Forms for RE-Bard for Maintenance Building Foundation |

Sub-grade for Administration Building |

Diaphragm for End Wall of Oxidation Ditch #2 |

Shotcrete Application to End Wall of Oxidation Ditch #1 |

Shotcrete Application to End Wall of Oxidation Ditch #1 |

Shotcrete Application to End Wall of Oxidation Ditch #1 |

Installation of Fire Line |

Installation of Fire Line |

Scaffolding and Platform for Rotary Drum Thickener |

Installation of Water Stop for Ultraviolet Disinfection Chamber Foundation |

Finishing Shotcrete Applied to End Wall of Oxidation Ditch #1 |

Finishing Shotcrete Application to End Wall of Oxidation Ditch #1 |

Finishing Shotcrete Application to End Wall of Oxidation Ditch # 1 |

Shotcrete for End Wall of Oxidation Ditch #2 |

Shotcrete Application to End Wall of Oxidation Ditch |

Shotcrete Application to Oxidation Ditch End Wall |

Effluent Pump Station Foundation Ready for Concrete |

Construction of Platform for the Rotary Drum Thickener |

Construction of Platform for the Rotary Drum Thickener |

Forms for Ultraviolet Disinfection Chamber Foundation |

Forms for Ultraviolet Disinfection Chamber Foundation |

Construction of Platform for the Rotary Drum Thickener |

Maintenance Building Foundation |

Maintenance Building Foundation |

Preparation of Maintenance Building Foundation |

Diaphragm of End Wall of Oxidation Ditch # 2 |

End Wall Connection for Oxidation Ditch |

Setting Rebar for North End Wall of Oxidation Ditch #2 |

End Wall Connection for Oxidation Ditch |

Tying Rebar for Oxidation Ditch End Wall |

Tying RE-bard at the Base of the End Wall of Oxidation Ditch |

Checking Diaphragm for End Wall of Oxidation Ditch |

Preparing to Shoot Concrete Onto End Wall of Oxidation Ditch # 1 |

Preparing to Shoot Concrete for End Wall of Oxidation Ditch #1 |

Curing Concrete Oxidation Ditch #1 |

Erecting Platform for Rotary Drum Thickener |

Clarifier Structure Complete |

Erecting Diaphragm for Oxidation Ditch End Wall |

Setting Rebar for Maintenance Building Foundation |

Preparing Foundation for Administration Building |

Setting Rebar for the Maintenance Building |

Final Preparation for Concrete Oxidation Ditch #2 |

Erecting Scaffold for End-Walls Oxidation Ditch # 1 |

Final Preparation for Concrete Oxidation Ditch #2 |

Erecting Scaffold for End-Walls, Oxidation Ditch # 1 |

Erecting Scaffold for End-Walls, Oxidation Ditch # 1 |

Early Morning Pre-pour Meeting for Oxidation Ditch # 2 |

Concrete Pump Setup for Early Morning Concrete Pour Oxidation Ditch #1 |

Preparing Concrete Samples for Quality Control |

Excavation of Ultraviolet Light Disinfection Chamber Foundation |

Foundation Forms for Maintenance Building |

Base Slab for Oxidation Ditch #1 |

Early Morning Discharge of Concrete to Concrete Pump |

Spreading Concrete |

Spreading Concrete Oxidation Ditch #2 |

Preparing Concrete Samples for Quality Control |

Placing Concrete Oxidation Ditch # 2 |

Placing Concrete Oxidation Ditch #2 |

Relocating Concrete Screed |

Floating Concrete Oxidation Ditch #1 |

Vibrating Concrete for Consolidation |

Grading for East Access Road |

Placing Concrete Oxidation Ditch # 2 |

Grading for East Access Road |

Cutting Reinforcing Bars |

Setting Scaffold for Construction of Rotary Drum Thickener Platform |

Diaphragm for End-Wall for Oxidation Ditch #1 |

Rebar Installed for Oxidation Ditch #1 |

Final Preparation for Concrete Oxidation Ditch #1 |

Early Morning Concrete Delivery |

Final Preparation for Concrete Oxidation Ditch #1 |

Concrete Pump Setup During Early Morning Pour for Oxidation Ditch #1 |

Early Morning Concrete Discharge to Concrete Pump |

Early Morning Pre-pour Meeting for Oxidation Ditch # 1 |

Early Morning Pre-pour Meeting for Oxidation Ditch # 1 |

Light Set-up for Early Morning Concrete Pour |

Ready for Concrete |

Early Morning Pumping of Concrete to Oxidation Ditch # 1 |

Placing Concrete for Oxidation Ditch #1 |

Spreading Concrete |

Spreading Concrete |

Spreading Concrete Oxidation Ditch #1 |

Floating Concrete Oxidation Ditch #1 |

Floating Concrete Oxidation Ditch #1 |

Drain in Oxidation Ditch #1 |

Floating Concrete Oxidation Ditch #1 |

Floating Concrete Oxidation Ditch #1 |

Early Morning Concrete Delivery |

Placing Concrete Oxidation Ditch #1 |

Placing Concrete Oxidation Ditch #1 |

Finishing Concrete for Oxidation Ditch #1 |

Waiting for Concrete Oxidation Ditch #1 |

Placing Concrete Oxidation Ditch #1 |

Floating Concrete for Oxidation Ditch #1 |

Vibrating Concrete Oxidation Ditch #1 |

Vibrating Concrete Oxidation Ditch #1 |

Vibrating Concrete Oxidation Ditch #1 |

Finishing Concrete Oxidation Ditch #1 |

OCWS Crew Preparing Seal for Valve Box RIB RW Distribution Line |

View of Site from the Stormwater Detention Basin |

Excavation for Ultraviolet Light Disinfection System |

Excavation for Ultraviolet Light Disinfection Chamber |

Administration Building |

Grading the Access Road |

Clarifier #1 |

Early Morning Concrete Placement Oxidation Ditch #1 |

Preparing the Subgrade for the Maintenance Building |

Concrete Placement Completed for Oxidation Ditch #1 Base Slab |

Concrete Placement Completed for Oxidation Ditch #1 Base Slab |

Keeping Concrete Wet for Curing Oxidation Ditch #1 Base Slab |

Keeping Concrete Wet for Curing Oxidation Ditch #1 Base Slab |

Preparing Rebar for Oxidation Ditch #2 Base Slab |

Keeping Concrete Wet for Curing Oxidation Ditch #1 Base Slab |

Preparing Sub-base Slab for Maintenance Building |