Forms for Generator Pad Digester and Rotary Drum Thickener Platform in Background |

MLSS Lines at the Location of the Splitter Box Between the Clarifiers and Oxidation Ditches |

DIP Fireline |

MLSS Lines at the Splitter Box |

Influent Line at the Headworks |

Influent Line at the Headworks |

DIP Fire and Potable Line Installation |

Layout of Electrical Building |

UV Disinfection Chamber |

Setting Forms for Top Cap of Oxidation Ditch |

Headworks Base Slab |

Inside Oxidation Ditch |

Influent Line at the Headworks |

Influent Line at the Headworks |

Setting CMU Walls for Administration Building |

Setting CMU Walls for Administration Building |

Yard Piping Encasement |

Yard Piping Encasement |

Yard Piping Encasements for 6” Drain Lines |

20” RAS Line at the Headworks |

36” Influent Line at the Headworks |

Compacting Backfill at the 36” Influent Line at the Headworks |

Generator Pad Adjacent to Oxidation Ditch |

Top Cap Formed for Oxidation Ditch Wall |

Forming for Top Cap for Oxidation Ditch Wall |

Floating the Base Slab for the Headworks |

The Maintenance Building Foundation |

The Maintenance Building Foundation |

Forms and Rebar for Maintenance Building Foundation |

UV Chamber |

Maintenance Building Slab |

Placement Concrete for Administration Building Foundation |

Setting Dowels for CMU Walls for Maintenance Building |

Installing Clarifier Baffles |

Preparing Sub-Grade for Electrical Building |

Forms for Generator Pad |

48” MLSS Lines |

Forms for Generator Pad |

Forms and Rebar for Headworks |

The Mind at Work |

The Body at Work |

Setting Dowels for CMU Walls for Maintenance Building |

Forms for Electrical Building |

Placement of Concrete for Administration Building |

Placement of Concrete for Administration Building |

Placement of Concrete for the Administration Building Foundation |

The Administration Building Foundation |

48” MLSS Line |

Administration Building Foundation |

Placement for Concrete for Administration Building |

Installing Electrical Conduit for Generator Pad |

Installing Electrical Conduit for Generator Pad |

Electrical Building Foundation |

Placement of Concrete for the Admin. Building Foundation |

Placement of Concrete for the Admin. Building Foundation |

Forms for the Top Cap for the Oxidation Ditch Walls |

48” MLSS lines at the Splitter Box |

Setting the Forms for the Top Cap for the Oxidation Ditch Walls |

Base Slab of Headworks |

48” MLSS Line |

Base Slab for the Headworks |

Monitoring Well Installation for RIBs |

Monitoring Well Installation |

Completed Monitoring Well |

Generator Pad |

Platform for Rotary Drum Thickener |

Admin Building Foundation |

Monitoring Well Installation |

Monitoring Well |

View Down the Middle of the Treatment Train |

Placement of Concrete for the Maintenance Building Foundation |

48” MLSS Line to Splitter Box |

Mixed Liquor Line from Oxidation Ditch to Splitter Box |

Generator Pad |

Electrical Building Foundation |

Preparation of the Maintenance Building Foundation for Concrete |

Placement of Concrete in the Maintenance Building Foundation |

Concrete Application to Interior of Oxidation Ditch Wall. |

Floating the Concrete in the Maintenance Building Foundation |

Maintenance Building Slab |

Maintenance Building Slab |

Leveling Concrete in Maintenance Building Slab |

Concrete for Maintenance Building Slab |

Maintenance Building Foundation Complete |

UV Disinfection Chamber |

48” MLSS Line to Splitter Box |

Subgrade Preparation fro the 48” MLSS Line |

Forms for Slab to Support 48” MLSS line |

Forms and RE-bar for the Headworks Foundation |

Forms for Generator Pad |

Forms for Electrical Building Slab |

Forms for Generator Pad |

UV Disinfection Chamber |

Lifting the Lift into the Clarifier |

Installation of Groundwater Monitoring Well for RIBs |

Admin Building Ready for Concrete |

Concrete Placement for the Administration Building Slab |

Interior of Oxidation Ditch |

Shotcrete Application to Interior of Oxidation Ditch |

Shotcrete Application to Interior of Oxidation Ditch |

Forms and RE-bar for UV Disinfection Chamber |

Mixed Liquor Line from Oxidation Ditch to Splitter Box |

UV disinfection Chamber |

48” Mixed Liquor Line from Oxidation Ditch to Splitter Box |

Placement of Concrete into Forms for UV Chamber Walls |

Placement of Concrete for UV Chamber Walls |

Shotcrete Application to End Wall of Oxidation Ditch #2 |

UV Disinfection Chamber |

Pumping Concrete to Maintenance Building Slab |

Placement of Concrete for Maintenance Building Slab |

Vibrating Concrete in Maintenance Building Slab |

Leveling Concrete in Maintenance Building Slab |

Floating Concrete for Maintenance Building Slab |

48” MLSS Line to Splitter Box |

Preparation of Sub-grade for Electrical Building Foundation. Platform for Rotary Drum Thickener in Background |

Checking the Concrete Temperature |

Concrete Slump Test |

Preparing Concrete Cylinders for Compressive Strength tests |

Maintenance Building Slab |

Forms and Re-bar for Ultraviolet Disinfection Chamber and Dewatering Well Points |

Scaffolding and Columns for Rotary Drum Thickener Platform |

Application of Shotcrete to Oxidation Ditch End Walls |

Forms for Re-Bar for Maintenance Building Foundation |

Positioning Concrete Pump for Effluent Pump Station Foundation |

Placing Concrete Into Ultraviolet Disinfection Chamber Foundation |

Placement of Concrete Into Effluent Pump Station Foundation |

Working the Concrete Placed Into UV Chamber Foundation |

Placement of Concrete into Effluent Pump Station Foundation |

Working the Concrete Placed into the UV Disinfection Chamber |

Building Pad for Electrical Building 1 |

Finishing Concrete Placed into Effluent Pump Station Foundation |

Pest Control Treatment for Administration Building Foundation |

Application of Shotcrete to Oxidation Ditch # 2 End Walls |

Laying Out the Baffles Inside Clarifier |

Finishing Concrete Placed Into UV Disinfection Chamber Foundation |

Concrete Stormwater Pipe Installed by OCWS Crews |

Concrete Stormwater Pipe |

Constantine Engineering Checks the Plumbness of the Rebar for the UV Disinfection Chamber Walls. |

Installation of the Effluent Weir in Clarifier |

Ductile Iron Plug Valve for MLSS Line to Splitter Box |

Installing Modular Concrete Forms for Walls of the UV Disinfection Basin
|

Installation of Vapor Barrier for Maintenance Building |

Installation of Modular Concrete Forms for Walls of the UV Disinfection Basin |

Installation of Modular Concrete Forms for UV Disinfection System |

Installation of Modular Forms for Walls of UV Disinfection Basin |

Placement of Modular Forms for Walls of UV Disinfection Basin |

Setting Modular Forms for Walls of UV Disinfection Basin |

Oxidation Ditch #2 |

Assembly of 42” DIP RAS Line from Ox Ditch to Splitter Box with 42” Plug Valve |

Constructing Platform From Which to Place Concrete into Forms for Walls of UV Disinfection Basin |

Laying Out Baffles inside of Clarifier |

Grading at North End of Entrance Road |