Pouring Shotcrete for Interior Walls of Oxidation Ditch |

Pre-Stressed Tendons for Oxidation Ditch Wall |

Foundation Slab for Electrical Building #1 |

UV Disinfection Chamber |

Grit Classifier Equipment Being Delivered |

UV Disinfection Chamber Structure |

RAS/WAS Pump Station |

Slab at Headworks Structure |
 |

Administration Building |
 |

RAS/WAS Pump Station |

Property Headworks Structure |

Foundation Walls for Re-Pump Station |

RE-Pump Station Foundation |

Foundation Walls for Re-Pump Station |

Foundation for the Garniers Re-pump Station Project |

Form for Pipe at Re-Pump Station |

Pouring Concrete for Foundation Walls at Re-pump Station |

Pouring Concrete for Re-Pump Foundation |

Pouring Concrete for Re-Pump Foundation |

Pouring Concrete at RE-Pump Station |

Pouring Concrete at RE-Pump Station |

Pouring Concrete at RE-Pump Station |

Pouring Concrete at RE-Pump Station |

Pouring Concrete at RE-Pump Station |
Setting Up to Pre-stress Oxidation Ditch Wall |

Tying Steel for Headworks Walls |

Preparing the Grade for the Electrical Building Foundation |

UV Disinfection Chamber Prior to Backfill |

Coming Up with the CMU Walls for the Administration Building |

Coming Up with CMU Walls for Administration Building |

RAS/WAS Line |

Diaphragm for Interior Wall for Oxidation Ditch |

Installing Yard Pipe |

Modular Forms and Re-Bar for Headworks Structure |

Setting Pre-Stressed Tendons for Oxidation Ditch |

Setting Pre-Stressed Tendons for Oxidation Ditch Wall |

Preparing Forms for Headworks Structure Foundation |

Preparing Forms for Headworks Structure Foundation |

Modular Forms for Headworks Structure Walls |

Preparing Grade for Electrical Building #1 |

UV Disinfection Chamber Structure Post Backfill |

Coming Up With Walls for Administration Building |

Coming Up With Walls for Administration Building |

Setting Pre-Stressed Tendons for Oxidation Ditch Walls |

Headworks Structure Foundation |

Modular Forms for Headworks Structure Walls |
 |

Garniers Re-pump Station Foundation |

Garniers Re-pump Station Foundation |
 |

Foundation Work at Re-Pump Station |
 |

Mobilization for Garniers Re-Pump Station |

Entrance to Garniers RE-Pump Station Project Site |

Initial Excavation for the Garniers Re-Pump Station |

Excavation for Garniers Re-Pump Station |

Excavation for Garniers Re-Pump Station Foundation |

Excavation for Garniers Re-pump Station Foundation |

Property Adjacent to Garniers RE-Pump Station Project Site |

Property Adjacent to Garniers RE-Pump Station Project Site |

Property Adjacent to Garniers RE-Pump Station Project Site |

Property Adjacent to Garniers RE-Pump Station Project Site |

Property Adjacent to Garniers RE-Pump Station Project Site |

Property Adjacent to Garniers RE-Pump Station Project Site |

Construction Trailer for Garniers Re-Pump Station Project |

Entrance to the Garniers Re-pump Station Project Site |

Entrance Sign for the Garniers Re-pump Station Project |

Excavation for the Garniers Re-pump Station Project |

Footing for the Garniers Re-pump Station |

Erection of 8” CMU Walls for the Administration Building at the Arbennie WRF Site |

Pouring Concrete for Oxidation Ditch Wall Cap |

Installation of Underground Utilities for the APWRF Project |

Installation of Yard Piping at the Headworks |

Underground Yard Piping at the Headworks |

Forms for Generator Pad |

Forms and Re-Bar for Generator Pad |

Floating Concrete for the Generator Pad |

Underground Electrical Conduit at the Electrical Building |

Removing Forms for Oxidation Ditch Wall Cap |

Preparing Forms for Headworks Slab |

Preparing Forms for Generator Pad |

Forms and Re-bar for Generator Pad |

Preparing Forms for RAS/WAS Pump Station Foundation |

Placement of Concrete for the RAS/WAS Pump Station |

Under Ground Fire Line |

Removing Forms for RAS/WAS Pump Station Foundation |

|

Finishing Concrete Placed in Generator Pad |

Placing Grout into the 8” CMU Walls for the Administration Building |

Setting Forms and Re-bar for the Garniers Re-pump Station Foundation |

Setting Forms and Re-bar for the Garniers Re-pump Station Foundation |

Setup for Pre-stressing the Oxidation Ditch Walls |

Installation of Underground Electrical Conduit at Electrical Building |

8” CMU Walls fo Administration and Maintenance Buildings |

Diaphram for Walls Interior to Oxidation Ditch |

Raw Influent Line at the Headworks |

Erection of Interior Walls Inside Oxidation Ditch |

Forms and Re-bar at the Headworks |

Forms and Re-bar at the Headworks |

Preparing for Pre-stressing of Oxidation Ditch Exterior Walls |

Placement of Concrete at the Headworks |

Underground Electrical Conduit at the Electrical Building |

Setting Electrical Conduit at the Electrical Building |

Diaphram for Oxidation Ditch Interior Wall |

Applying Shotcrete to Oxidation Ditch Interior Wall |

Setting Electrical Conduit at the Electrical Building |

Setting Electrical Conduit at the Electrical Building |

8” CMU Walls at the Administration and Maintenance Buildings |

Forms for the Headworks Foundation |

Finishing Concrete Slab at the Headworks |

Finishing Concrete Slab at Headworks |

Project Sign at the Garniers RE-pump Station |