Arbennie Pritchett Water Reclamation Facility Arbennie Pritchett Water Reclamation Facility Program, Okaloosa County Water and Sewer Department Okaloosa County and Constantine Engineering
Constantine Engineering Okaloosa County Water & Sewer

Photo Gallery - July, 2008

   

Setting Rebar for the Roll-off Runway

Setting Rebar for the Roll-off Runway

Pouring the Tie Beams for the Maintenance Building

Pouring the Tie Beams for the Maintenance Building

Setting the Water Stop for the UV Disinfection Chamber

Setting the Water Stop for the UV Disinfection Chamber

Setting the Water Stop for the UV Disinfection Chamber

Setting the Water Stop for the UV Disinfection Chamber

Installing Facility Gravity Sewage Collection System

Installing Facility Gravity Sewage Collection System

RAS/WAS Pump Station

RAS/WAS Pump Station

Applying Top Coat to External Wall of Oxidation Ditch

Applying Top Coat to External Wall of Oxidation Ditch

Setting the Grade and Forms  for Electrical Building and Generator Enclosure

Setting the Grade and Forms for Electrical Building and Generator Enclosure

Headworks Support Walls

Headworks Support Walls

Influent Pipes at the Headworks

Influent Pipes at the Headworks

Setting Forms and Rebar for the Roll off Runway

Setting Forms and Rebar for the Roll off Runway

Maintenance and Administration Building Construction

Maintenance and Administration Building Construction

Yard Piping

Yard Piping

Fabricating Facility Yard Piping

Fabricating Facility Yard Piping

Setting the Water Stop for the UV Disinfection Chamber

Setting the Water Stop for the UV Disinfection Chamber

Setting Water Stop for UV Disinfection Chamber and effluent Pump Station

Setting Water Stop for UV Disinfection Chamber and effluent Pump Station

Electrical Building #1 Construction

Electrical Building #1 Construction

Maintenance Building

Maintenance Building

RAS/WAS Pump Station

RAS/WAS Pump Station

Headworks

Headworks

Interior Walls of Oxidation Ditch

Interior Walls of Oxidation Ditch

Finishing Top Coat of Oxidation Ditch

Finishing Top Coat of Oxidation Ditch

Grade for Electrical Building

Grade for Electrical Building

Setting Forms and Rebar for Roll-off Runway

Setting Forms and Rebar for Roll-off Runway

Setting Tie Beam for Administration Building

Setting Tie Beam for Administration Building

Maintenance Building

Maintenance Building

Setting Rebar and Modular Forms for UV Disinfection Chamber

Setting Rebar and Modular Forms for UV Disinfection Chamber

Rebar for UV Disinfection Chamber and Effluent Pump Station Walls

Rebar for UV Disinfection Chamber and Effluent Pump Station Walls

Electrical Building #1

Electrical Building #1

Setting Grade for Electrical Building #2 and Generator Enclosure

Setting Grade for Electrical Building #2 and Generator Enclosure

Pouring Concrete for Top Coat Application

Pouring Concrete for Top Coat Application

Headworks Support Walls

Headworks Support Walls

Influent Pipe and Headworks Support Wall

Influent Pipe and Headworks Support Wall

Baffle and Effluent Trough for Clarifier

Baffle and Effluent Trough for Clarifier

Rebar and Modular Forms for UV Disinfection Chamber

Rebar and Modular Forms for UV Disinfection Chamber

Steel Catwalks

Steel Catwalks

Trench Wall for Garniers Re-pump Station

Trench Wall for Garniers Re-pump Station

Setting Grade for Garniers Re-pump Station Foundation

Setting Grade for Garniers Re-pump Station Foundation

Forms and Rebar for Garniers RE-pump Station Foundation

Forms and Rebar for Garniers RE-pump Station Foundation

Trench Wall for Garniers Re-pump Station

Trench Wall for Garniers Re-pump Station

Electrical Conduit for the Garniers RE-pump Station

Electrical Conduit for the Garniers RE-pump Station

Electrical Conduit for the Garniers Re-pump Station

Electrical Conduit for the Garniers Re-pump Station

Setting forms for Garniers Re-pump station Foundation

Setting forms for Garniers Re-pump station Foundation

Setting Electrical Conduit for Garniers Re-pump Station

Setting Electrical Conduit for Garniers Re-pump Station

Electrical Conduit for Garniers Re-pump Station

Electrical Conduit for Garniers Re-pump Station

Setting Electrical Conduit for the Garniers Re-pump Station

Setting Electrical Conduit for the Garniers Re-pump Station

Setting Electrical Conduit for Garniers Re-pump Station

Setting Electrical Conduit for Garniers Re-pump Station

Electrical Conduit for the Garniers Re-pump Station

Electrical Conduit for the Garniers Re-pump Station

Pumping Concrete for Headworks Walls

Pumping Concrete for Headworks Walls

Pumping Concrete into Forms for Headworks Walls

Pumping Concrete into Forms for Headworks Walls

Applying Shotcrete Exterior Walls of Oxidation Ditch

Applying Shotcrete Exterior Walls of Oxidation Ditch

Preparing Forms for Roll Off Runway

Preparing Forms for Roll Off Runway

Constructing Forms for Roll-Off Runway

Constructing Forms for Roll-Off Runway

Effluent Pump Station

Effluent Pump Station

UV Disinfection Chamber

UV Disinfection Chamber

Placing Backfill for On-Site Sewage Collection System

Placing Backfill for On-Site Sewage Collection System

RAS/WAS Pump Station and Shotcrete Operation (Background)

RAS/WAS Pump Station and Shotcrete Operation (Background)

Applying Shotcrete to Exterior Wall of Oxidation Ditch

 

Applying Shotcrete to Exterior Wall of Oxidation Ditch

Applying Shotcrete to Exterior Wall of Oxidation Ditch

Headworks

Headworks

Compacting Backfill Adjacent to Administration Building

Compacting Backfill Adjacent to Administration Building

Preparing Columns for Administration Building

Preparing Columns for Administration Building

Setting Tie Beam Forms for the Administration Building

Setting Tie Beam Forms for the Administration Building

Setting Grade for Conduit and Drain Pipe Adjacent to the Administration Building

Setting Grade for Conduit and Drain Pipe Adjacent to the Administration Building

Construction of 8” CMU Walls for Electrical Building #1

Construction of 8” CMU Walls for Electrical Building #1

Forms for Topcoat of Exterior Wall of Oxidation Ditch

Forms for Topcoat of Exterior Wall of Oxidation Ditch

Setting Conduit for Electrical Building #2

Setting Conduit for Electrical Building #2

RAS/WAS Pump Station

RAS/WAS Pump Station

RAS/WAS Pump Station

RAS/WAS Pump Station

Construction Debris

Construction Debris

Setting Columns for Administration Building

Setting Columns for Administration Building

Setting Columns for Administration Building

Setting Columns for Administration Building

Setting Columns for Administration Building

Setting Columns for Administration Building

Setting Forms for Connection Between the UV Disinfection Chamber and Effluent Pump Station

Setting Forms for Connection Between the UV Disinfection Chamber and Effluent Pump Station

Construction of 8” CMU Walls for Electrical Building #1

Construction of 8” CMU Walls for Electrical Building #1

Effluent Pump Station

Effluent Pump Station

Setting Forms for Slab Connecting the UV Disinfection Chamber and the Effluent Pump Station

Setting Forms for Slab Connecting the UV Disinfection Chamber and the Effluent Pump Station

Applying Top Coat for Exterior Wall of Oxidation Ditch

Applying Top Coat for Exterior Wall of Oxidation Ditch

RAS/Was Pump Station

RAS/Was Pump Station

Applying Top Coat to Exterior Wall of Oxidation Ditch

Applying Top Coat to Exterior Wall of Oxidation Ditch

Pumping Concrete into Columns for the Administration Building

Pumping Concrete into Columns for the Administration Building

Setting Forms for Slab Connecting the UV Chamber and the Effluent Pump Station

Setting Forms for Slab Connecting the UV Chamber and the Effluent Pump Station

Roll Off Runway

Roll Off Runway

Forming Base Slab for Re-Pump Station

Forming Base Slab for Re-Pump Station

Forming Base Slab for Re-Pump Station

Forming Base Slab for Re-Pump Station

Forming Base Slab for Re-Pump Station

Forming Base Slab for Re-Pump Station

Forming Base Slab for Re-Pump Station

Forming Base Slab for Re-Pump Station

 

Installation of On-Site Sewage Collection System

Installation of On-Site Sewage Collection System

CMU Wall Construction for Electrical Building #1

CMU Wall Construction for Electrical Building #1

UV Disinfection Chamber

UV Disinfection Chamber

Effluent Pump Station

Effluent Pump Station

Maintenance Building

Maintenance Building

RAS/WAS Pump Station

RAS/WAS Pump Station

Pre-Stressing Inner Walls of Oxidation Ditch

Pre-Stressing Inner Walls of Oxidation Ditch

Headworks

Headworks

Headworks

Headworks

Electrical Building #2Electrical Building #2

Grouting 8” CMU Walls of Administration Building

Grouting 8” CMU Walls of Administration Building

Headworks

Headworks

Applying Shotcrete to Exterior Walls of Oxidation Ditches

Applying Shotcrete to Exterior Walls of Oxidation Ditches

Influent Pipes at the Headworks

Influent Pipes at the Headworks

Installation of Conduit at Electrical Building #2

Installation of Conduit at Electrical Building #2

Applying Shotcrete to Exterior Walls of Oxidation Ditches

Applying Shotcrete to Exterior Walls of Oxidation Ditches

Backfill Around Trench Walls at Re-pump Station

Backfill Around Trench Walls at Re-pump Station

Backfill Around Trench Walls at Re-Pump Station

Backfill Around Trench Walls at Re-Pump Station

Backfill Around Trench Walls at Re-Pump Station

Backfill Around Trench Walls at Re-Pump Station

Backfill Around Trench Walls at Re-Pump Station

Backfill Around Trench Walls at Re-Pump Station

Backfill Around Trench Walls at Re-Pump Station

Backfill Around Trench Walls at Re-Pump Station

Backfill Around Trench Walls at Re-Pump Station

Backfill Around Trench Walls at Re-Pump Station

 