Setting Rebar for the Roll-off Runway |

Pouring the Tie Beams for the Maintenance Building |

Setting the Water Stop for the UV Disinfection Chamber |

Setting the Water Stop for the UV Disinfection Chamber |

Installing Facility Gravity Sewage Collection System |

RAS/WAS Pump Station |

Applying Top Coat to External Wall of Oxidation Ditch |

Setting the Grade and Forms for Electrical Building and Generator Enclosure |

Headworks Support Walls |

Influent Pipes at the Headworks |

Setting Forms and Rebar for the Roll off Runway |

Maintenance and Administration Building Construction |

Yard Piping |

Fabricating Facility Yard Piping |

Setting the Water Stop for the UV Disinfection Chamber |

Setting Water Stop for UV Disinfection Chamber and effluent Pump Station |

Electrical Building #1 Construction |

Maintenance Building |

RAS/WAS Pump Station |

Headworks |

Interior Walls of Oxidation Ditch |

Finishing Top Coat of Oxidation Ditch |

Grade for Electrical Building |

Setting Forms and Rebar for Roll-off Runway |

Setting Tie Beam for Administration Building |

Maintenance Building |

Setting Rebar and Modular Forms for UV Disinfection Chamber |

Rebar for UV Disinfection Chamber and Effluent Pump Station Walls |

Electrical Building #1 |

Setting Grade for Electrical Building #2 and Generator Enclosure |

Pouring Concrete for Top Coat Application |

Headworks Support Walls |

Influent Pipe and Headworks Support Wall |

Baffle and Effluent Trough for Clarifier |

Rebar and Modular Forms for UV Disinfection Chamber |

Steel Catwalks |

Trench Wall for Garniers Re-pump Station |

Setting Grade for Garniers Re-pump Station Foundation |

Forms and Rebar for Garniers RE-pump Station Foundation |

Trench Wall for Garniers Re-pump Station |

Electrical Conduit for the Garniers RE-pump Station |

Electrical Conduit for the Garniers Re-pump Station |

Setting forms for Garniers Re-pump station Foundation |

Setting Electrical Conduit for Garniers Re-pump Station |

Electrical Conduit for Garniers Re-pump Station |

Setting Electrical Conduit for the Garniers Re-pump Station |

Setting Electrical Conduit for Garniers Re-pump Station |

Electrical Conduit for the Garniers Re-pump Station |

Pumping Concrete for Headworks Walls |

Pumping Concrete into Forms for Headworks Walls |

Applying Shotcrete Exterior Walls of Oxidation Ditch |

Preparing Forms for Roll Off Runway |

Constructing Forms for Roll-Off Runway |

Effluent Pump Station |
 |

UV Disinfection Chamber |

Placing Backfill for On-Site Sewage Collection System |

RAS/WAS Pump Station and Shotcrete Operation (Background) |

|

Applying Shotcrete to Exterior Wall of Oxidation Ditch |

Headworks |

Compacting Backfill Adjacent to Administration Building |

Preparing Columns for Administration Building |

Setting Tie Beam Forms for the Administration Building |

Setting Grade for Conduit and Drain Pipe Adjacent to the Administration Building |
 |

Construction of 8” CMU Walls for Electrical Building #1 |

Forms for Topcoat of Exterior Wall of Oxidation Ditch |

Setting Conduit for Electrical Building #2 |

RAS/WAS Pump Station |

RAS/WAS Pump Station |

Construction Debris |

Setting Columns for Administration Building |

Setting Columns for Administration Building |

Setting Columns for Administration Building |

Setting Forms for Connection Between the UV Disinfection Chamber and Effluent Pump Station |

Construction of 8” CMU Walls for Electrical Building #1 |

Effluent Pump Station |

Setting Forms for Slab Connecting the UV Disinfection Chamber and the Effluent Pump Station |

Applying Top Coat for Exterior Wall of Oxidation Ditch |

RAS/Was Pump Station |

Applying Top Coat to Exterior Wall of Oxidation Ditch |

Pumping Concrete into Columns for the Administration Building |

Setting Forms for Slab Connecting the UV Chamber and the Effluent Pump Station |

Roll Off Runway |

Forming Base Slab for Re-Pump Station |

Forming Base Slab for Re-Pump Station |

Forming Base Slab for Re-Pump Station |

Forming Base Slab for Re-Pump Station |
|

Installation of On-Site Sewage Collection System |

CMU Wall Construction for Electrical Building #1 |

UV Disinfection Chamber |

Effluent Pump Station |

Maintenance Building |

RAS/WAS Pump Station |

Pre-Stressing Inner Walls of Oxidation Ditch |

Headworks |

Headworks |
Electrical Building #2 |

Grouting 8” CMU Walls of Administration Building |

Headworks |

Applying Shotcrete to Exterior Walls of Oxidation Ditches |

Influent Pipes at the Headworks |

Installation of Conduit at Electrical Building #2 |

Applying Shotcrete to Exterior Walls of Oxidation Ditches |

Backfill Around Trench Walls at Re-pump Station |

Backfill Around Trench Walls at Re-Pump Station |

Backfill Around Trench Walls at Re-Pump Station |

Backfill Around Trench Walls at Re-Pump Station |

Backfill Around Trench Walls at Re-Pump Station |

Backfill Around Trench Walls at Re-Pump Station |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
|