Roof Truss Installation for the Garniers Re-pump Station |

Roof Truss installation for the Garniers Re-pump Station |

Roof Truss installation for the Garniers Re-pump Station |

Roof Truss installation for the Garniers Re-pump station |

Roofing Sheeting installation for the Garniers Re-pump Station |
 |

Roofing Sheeting Installation for the Maintenance Building at the Arbennie Pritchett WRF Project Site |

Installation of Sub-grade Electrical Conduit |

UV Disinfection Chamber and Effluent Pump Station |

Clarifier Mechanism Installed |

View of RAS/WAS Pump Station and Clarifier #2 |

Roofing the Maintenance Building APWRF |
 |
 |
 |

Weir and Effluent Trough Clarifier #1 APWRF |
 |

Anchor During Torque Testing of Clarifier Mechanism |

Center Mechanism of Clarifier During Torque Test |

Clarifier Rake During Torque Test |

Completion of Tie Beams and Columns at the Admin Building APWRF |

Roofing Installation at the Maintenance Building APWRF |

Headworks |

Headworks APWRF |

Headworks APWRF |

Construction of Upper Deck for Oxidation Ditch |

Installation of Roof Truss for the Admin Building APWRF |

Preparing Sub-grade for Centrifuge Foundation |

Forms for Blower Pad |

Headworks |

Influent Lines at Headworks |

Headworks |

Roof Trusses at Admin Building |

Roof Truss Installation at the Admin Building |

Roof Truss Installation at the Admin Building |

Roof Truss Installation at the Admin Building |

Preparing Forms for Tie Beam at Garniers RE-pump Station |

Setting Forms for Tie Beam at Garniers Re-pump Station |

Delivery of Rail Crane for the Garniers Re-pump Station |

Off-loading Overhead Crane at Garniers Re-pump Station |

Garniers Re-pump Station Project Site |

Interior of Garniers Re-pump Station |

Exterior of Garniers Re-pump Station |

Installing Overhead crane at Garniers Re-pump Station |

Installation of Overhead Crane at Garniers Re-pump Station |

Overhead Crane at Garniers Re-pump Station |

Electrical Building #2 and Generator |

Sub-grade Electrical Conduit |

Effluent Pump Deck |

UV Disinfection Chamber |

Clarifier Mechanism |

RAS/WAS Pump Station |

RAS/WAS Pump Station |

Headworks |

Headworks |

Influent Pipes at the Headworks |

RAS/WAS Pump Station |

Electrical Building #2 |

Electrical Building #2 |

Setting Roof Trusses at Electrical Building #2 |

Clarifier Pop-off |

Anti-Floatation Valve at Clarifier |

Clarifier Mechanism |

Setting Rake for Clarifier Mechanism |

RAS/WAS Pump Station |

Setting Soffit for Electrical Building #2 |

Su-grade Work at Electrical Building #1 |

UV/Disinfection Chamber |

Finishing Concrete at effluent Pump Deck |

RAS/WAS Pump Station |

RAS/WAS Pump Station |

Pumping Concrete to RAS/WAS Pump Station Walls |

Pumping Concrete to RAS/WAS Pump Station Walls |
 |

Setting Roof Trusses for Maintenance Building |

Exterior Block Samples |

Exterior Block Samples for Building Fascia |

Exterior Block Samples for Building Fascia |

Exterior Block Samples for Building Fascia |

Administration Building |

Pipe Delivery |

Setting Roof Trusses for the Maintenance Building |

Water Hyacinths for Nitrogen Removal in Existing Garniers Effluent Holding Pond |
|

Block Work Continues at the Garniers Re-pump Station |

Block Work Continues at the Garniers Re-Pump Station |

Block Work at the Garniers Re-Pump Station |

Interior of the Garniers RE-Pump Station |

Block Work at the Garniers RE-Pump Station |

Block Work at the Garniers Re-Pump Station |

Reinforcing of CMU Wall at the Garniers Re-Pump Station |

View from Top of CMU Wall at the Garniers Re-Pump Station |

Pumping Grout into CMU Wall at the Garniers Re-Pump Station |

Pumping Grout in the CMU Wall at the Garniers Re-pump Station |

Pumping Grout in the CMU Wall at the Garniers Re-pump Station |

Pumping Grout into CMU Wall at the Garniers Re-Pump Station |

Pumping Grout into the CMU Wall at the Garniers Re-pump Station |

Installation of Sub-grade Electrical Conduit from Electrical Building #2 |

Installation of 6”DIP Reuse Line and 6” DIP WAS Line |

Installation of 6” DIP WAS and Reuse Lines |

RAS/WAS Pump Station |

Setting of Clarifier Mechanism |

RAS/WAS Pump Station |

Setting Forms for Pump Deck at Effluent Pump Station |

Electrical Building #1 |

View from Effluent Pump Station to Maintenance Building |

Sub-grade for Centrifuge Structure |

Setting of 36” Influent Line to UV Disinfection Chamber |

Installation of Grounding Cable |

Setting Forms for Pump Deck at the Effluent Pump Station |

Sub grade Electrical Conduit at the Administration Building |

Form for Tie Beam at the Maintenance Building |

Modular Forms for Walls of RAS/Was Pump Station |

Footings for the RAS/WAS Pump Station Upper Structure |

RAS/Was Pump Station |

Vertical Construction at the Headworks |
Interior Walls of Oxidation Ditch |

Setting Roof Trusses for Electrical Building #2 |

Pouring Tie Beam at the Maintenance Building |

Pumping Concrete to the Tie Beam Forms at the Maintenance Building
|

Moving a Large DIP Section |

Forms for Pump Deck at the Effluent Pump Station |

Forms at the Pump Deck at the Effluent Pump Station |

UV Chamber and Effluent Pump Station |

Wet well of Effluent Pump Station |

Sub Grade Electrical Conduit |

Sub grade Electrical Conduit |

Crane Setting Equipment at Clarifier |

On-Site Sanitary Lift Station |

RAS/WAS Pump Station |

Headworks |

Setting Roof Trusses at Electrical Building #2 |

Pumping Concrete to Tie Beam at Maintenance Building |
|

Administration Building |

Maintenance Building |

Electrical Building #1 |

Installing Electrical Conduit from Electrical Building #2 to Centrifuge |

Installing Electrical Conduit to Centrifuge |

Interior of Oxidation Ditch |

Modular Forms for RAS/WASA Pump Station |

Completion of Clarifier Mechanism |

Clarifier Mechanism |

Setting Forms for RAS/WAS Pump Station |

Installing 42” line from Headworks to Oxidation Ditches |

Compacting Backfill Over 42” Line from Headworks to Oxidation Ditches |

Offloading Screw Conveyors for Headworks Screens |

Screw Pumps for Headworks Mechanical Screens |

Conduit at the Admin Building |

Leak Testing of UV Chamber and Effluent Pump Station |

Setting Steel for the Admin Building Tie Beam |

Setting the Modular Forms for the RAS/WAS Pump Station |

Completed Clarifier Mechanism |

Interior Wall of Oxidation Ditch |

Clarifier Mechanism |

Setting Forms for RAS/WAS Pump Station |

Installing 42” Line from Headworks to Oxidation Ditch |

Installing 42” Influent Line |

Pumping Shotcrete |

Installing 42” Influent Line |

Pumping Shotcrete for Interior of Oxidation Ditch |
 |

Transformer Pad at Electrical Building #2 |

On-Site Sanitary Pump Station |

On Site Sanitary Pump Station |

Installing Electric Conduit from Electrical Building #2 to Centrifuge |

Roll-Off Slab |

Roll-Off Slab |

CMU Work at Garniers Re-Pump Station |

CMU Work at Garniers Re-pump |
 |
 |

Pumping Grout into CMU Walls at Garniers Re-pump |

Grouting Wall at Garniers Re-pump |

Grouting CMU Wall |

Grouting CMU Wall at Garniers Re-pump |

Grouting CMU Wall |

Grouting CMU Wall |

Grout |

CMU Wall Construction at Garniers Re-pump |

CMU Wall Construction |

CMU wall Construction at Garniers Re-pump |

CMU Wall Construction |
|