
Administration Building Arbennie Pritchett WRF |

Administration Building Garniers Re-Pump Station |

Electrical Pull Boxes Garniers RE-Pump Station |

Electrical Pull Boxes at the Arbennie Pritchett WRF |

Connecting 36” Effluent Pipe to Clarifier #1 |
 |

Generator and Transformer |

Administration Building APWRF |

Headworks |

Administration Building |

Headworks |

Blower Pads |

Installation of Furring at the Garniers Re-Pump Station |

Headworks Construction |

Air Handler at the Garniers Re-Pump |

Installation of Air Handlers at the Garniers Re-Pump Station |

Piping Installation at the Garniers Re-Pump Station |

Entrance at the Garniers Re-Pump Station |

Metal Studwork at the Garniers Re-Pump Station |

Piping Installation at the Garniers Re-Pump Station |

Pump Delivery at the Garniers Re-Pump Station |

Vibration Dampeners at the Garniers Re-Pump Station |

Pump Delivery Garniers Re-Pump Station |

Pad for Mechanical Controls at the Garniers Re-Pump Station |

Sludge Container Roll-off Pad |

Pump Motor for the Garniers Re-Pump Station |

Electrical Control Panel |

Administration Building for the Arbennie Pritchett WRF |

Sub grade Electrical Duct |
Forms for Blower Foundation |

Forming Columns and Walls for the RAS/WAS Pump Station |

Electrical Control Panel Arbennie Pritchett WRF |

Columns to Support Aerators in the Oxidation Ditch |

Yard Piping Installation |

Another View of the Wall and Support Construction for the Grit Removal Systems at the Headworks |

Forming the Walls and Supports for the Vortex Grit Chambers at the Headworks |

Electrical Building #2 |

Discharge Side of the Grit Removal Chambers at the Headworks |

Sanitary Lift Station |

Influent Side of the Headworks Where the Mechanical Screens are to be Located. |

Administration Building |

Electrical Control Panel |

Maintenance Building |

Delivery of Electrical Control Panels |

Blower Pads |

Rotary Drum Thickener Installed at the Digester |

Delivery of Transformer |

Bridge Crane Foundation |

Air Handlers for the Garniers Re-Pump Station |

Installation of Effluent Line from Clarifiers |

Pad for Condensing Unit |
Transformer Pad |

Forms for Air Handler Pads |

Pad for Air Handlers at the Garniers Re-Pump Station |

Forms for Concrete Apron/Driveway |

Electrical Access for Condenser |

Pouring Concrete for Air Handler Pads |

Electrical Access for Condenser Unit |

Poured Apron for Entrance |

Pouring Concrete for the Air Handler Pads |

Pouring Concrete for Air Handler Pads |

DIP Elbow for Pump Station Piping |

Administration Building Arbennie Pritchett WRF |

In-plant Sanitary Sewage Lift Station Arbennie Pritchett WRF |

Installation of 42” Line from RAS/WAS to Clarifiers |

Installation of 42” Line Effluent Line from Clarifier #1 |

RAS WAS Pump Station |

RAS/WAS Pump Station |

Headworks |

Headworks |

Headworks |

Raw Sewage Influent Line |

Electrical Building #2 |

Interior of Electrical Building #2 |

Sub-grade Electrical Conduit |
 |

Tie-ins to Existing Piping |

Administration Building |

Roofing of the Administration Building |

Setting Reinforcing Steel for Centrifuge Columns |
Tie-in 30” to effluent pump station |
 |
 |

Roofing Maintenance Building |

42” from Clarifier |

Blower Pad |

Brick Fascia for the Electrical Building #2 |
 |
 |

Roof Panel Installation Garniers Re-Pump |

Installation of roof Panels Garniers Re-pump Station |

Forms for Electrical Equipment Pads Garniers Re-pump |

Poured Electrical Equipment Pads Garniers Re-pump |

Electrical Equipment Pad Garniers Re-pump |

Electrical Equipment Pad Garniers Re-ump |

Electrical Equipment Pad Garniers Re-pump |

Electrical Conduit Garniers Re-pump |

Transformer Pad Garniers Re-pump |

Electrical Feed to Garniers Re-pump |
|

Admin Building Arbennie Pritchett WRF |

Installing Roof Trusses for the Administration Building at Arbennie WRF |

Installation of Roof Trusses for the Administration Building for the Arbennie Pritchett WRF |

Foundation for Centrifuge |

Administration and Maintenance Buildings at Arbennie Pritchett WRF |

Installation of Roof Trusses for the Maintenance Building at the Arbennie Pritchett WRF |

Site Meeting at Arbennie Pritchett WRF, Maintenance Building in the Background |

Forming walls of the RAS/WAS Pump Station |

Top Slab for In-plant Lift Station |

Forms for Headworks Deck and Walls |

Headworks |

Sub-grade Pipe |

Headworks |

Influent Pipes at Headworks |

Deck Construction at Oxidation Ditch |

Headworks |

Site Meeting at the Headworks |

Roll-off Slab |

Roll-off Slab |
 |

DIP |

Installing Roof Trusses for the Administration Building |

Inspecting an Interior Room |

Interior of Roof at Maintenance Building |
 |

Interior Walls of Maintenance |

Electrical Duct Banks |

Electrical Duct Banks |

Administration Building |

Administration Building |

Upper Deck Construction of Oxidation Ditch |

Locating Sub-grade Utilities |

Locating Sub-grade Utilities |

Using Ground Penetrating Radar to Locate Sub grade Utilities |

Using Ground Penetrating Radar to Locate Sub-grade Utilities |

Verifying Locations of Sub-grade Utilities |

Installing Roof Panels on Garniers Re-pump Station |

Installing Sub-grade Utilities Garniers Re-pump |

Installing Sub-grade Electrical Garniers Re-pump |

Installing Sub-grade Electrical Garniers Re-pump |

Forming Equipment Pads at Garniers Re-pump |

Roofing at Garniers Re-pump |

Roofing at Garniers Re-pump |

Overhead Crane Garniers Re-pump |