Arbennie Pritchett Water Reclamation Facility Arbennie Pritchett Water Reclamation Facility Program, Okaloosa County Water and Sewer Department Okaloosa County and Constantine Engineering
Constantine Engineering Okaloosa County Water & Sewer

Program Teams and Contacts

The Project Team for the Arbennie Pritchett WRF Program consists of the following:

County Representatives

Okaloosa County Water and Sewer Department (OCWS)

Okaloosa County Board of County CommissionersOCWS is responsible for the construction and operation of the new Arbennie Pritchett WRF and the program is the responsibility of OCWS. OCWS staff will control the development of the projects and the Program Manager will report directly to OCWS.

Mr. Jeff Littrell, Director
1804 Lewis Turner Boulevard, Suite 300
Ft. Walton Beach, FL 32547
Phone: (850) 651-7172
Fax: (850) 651-7193
Email: jlittrell@co.okaloosa.fl.us
Mr. Robert Mauzy, Wastewater System Manager
714 Essex Road
Fort Walton Beach, FL 32547
Phone: (850) 651-7133
Fax: (850) 651-7593
Email: rmauzy@co.okaloosa.fl.us

Program Manager

The Constantine Group (TCG)

The Constantine Group, Inc.The County has retained The Constantine Group (TCG) as its Program Management Consultant for this Project. TCG has responsibility for coordinating all activities associated with the Arbennie Pritchett WRF Program including decommissioning of the existing Garniers WWTP, collection system modifications, construction of the Arbennie Pritchett WRF, construction of the RIB system, and regulatory permitting.

Mr. James P. Kizer, Jr., P.E., Program Manager
2004 Lewis Turner Boulevard, Suite B
Fort Walton Beach, FL 32547
Phone: 850.244.5800
Fax: 850.862.5808
Email: jkizer@tcgeng.com
 

^ Back to Top

Arbennie Pritchett DCP Consultant

HDR Engineer, Inc. (HDR)

HDR Engineer, Inc. logoThe County retained HDR Engineering, Inc. (HDR) as the consultant to develop the Design Criteria Package (DCP) as required by the CCNA. HDR worked with TCG, the County, and representatives of the Florida Department of Environmental Protection (FDEP), Pensacola Office preparing the DCP and the other D-B contract documents.

Arbennie Pritchett Design-Builder

CDM Constructors, Inc. logoCDM Constructors, Inc. (CDM) was contracted to serve as the Design-Builder for the new Arbennie Pritchett WRF Project. CDM is responsible for the design, construction, startup, and performance of the new WRF. CDM will coordinate with TCG, HDR, the County, and other consultants during the construction of the new WRF.

Rapid Infiltration Basin Design Engineer

Polyengineering of Florida, Inc.

Polyengineering of Florida, Inc.The County retained Polyengineering of Florida, Inc. as the design engineer for the design and construction of the new 10 mgd Rapid Infiltration Basin Project. Polyengineering will develop the Design Contract Documents and provide services during construction to support TCG and the County.

Rapid Infiltration Basin Geotechnical Consultant

Gallet & Associates Gulfcoast, Inc. logoGallet & Associates Gulfcoast, Inc.

The County retained Gallet and Associates Gulfcoast, Inc. as the geotechnical engineering consultant for the design of the RIBs. Gallet performed the geotechnical exploration, groundwater modeling and mounding analysis.

Garniers Re-Pumping Station Design Engineer

HDR Engineer, Inc. (HDR)

HDR Engineer, Inc. logoThe County retained HDR Engineering, Inc. as the design engineer for the design and construction of the new Garniers Re-Pumping Station Project. HDR will develop the Design Contract Documents and provide services during construction to support TCG and the County.

^ Back to Top

© Copyright All Rights Reserved. Privacy Policy | Terms of Use | Site Map |
WEB Site Maintained by The Constantine Group