Arbennie WRF

  • Precon
    • Clarifier 1 - Placed concrete encasement for 42" influent pipe.
    • Clarifier 2 - Excavated and placed concrete mud slab for 42" influent pipe.
    • Ox Ditches - Erected scaffolding for exterior walls.
  • CDM
    • Continue to prepare bid packages for mechanical and general contactors
  • OCWS Construction (RIBS)
    • Continue to install additional 30" piping that will feed ribs 10 thru 18

 