Week ending June 7, 2008

Arbennie WRF

  • Coltin Electric
    • Performed electrical work for Lord and Sons.
  • RDT
    • UV Channel / Effluent Pump Station
      • Idle
    • Headworks
      • Poured 2nd section of Headworks base slab
    • Clarifiers
      • Clarifier # 1- Idle.
      • Clarifier # 2- Idle.
    • RAS/WAS Pump Station
      • Placed underground piping and concrete pipe encasement
      • Placed forms, rebar, and concrete for the bottom of the wet well channel
    • State Civil
      • Continue installing potable water and fire lines
  • Lord and Sons
    • Maintenance Bldg
      • Idle
    • Administration Bldg
      • Placed and poured grout for first bond beam of 8” CMU walls.
    • Electrical Building
      • Installation of electrical conduit for base slab.
  • Pre Con
    • Digester
      • Idle
    • Oxidation Ditches
      • Oxidation Ditch #1 – Began erecting diaphragm for interior wall.
      • Oxidation Ditch #2 – Began erecting diaphragm for interior wall.
  • CDM
    • Weekly Progress Meeting.
    • Subcontractor Coordination.

RIBS

  • OCWS Construction Crews
    • Grading and seeding continues
    • Continued placement of rock for access road.
    • Installing Concrete headwalls.

Garniers Re-pump Station

  • Speegle Construction
    • Continued installing rebar for pipe trench base slab
    • Weekly meeting with Speegle.