Arbennie Pritchett Water Reclamation Facility Arbennie Pritchett Water Reclamation Facility Program, Okaloosa County Water and Sewer Department Okaloosa County and Constantine Engineering
Constantine Engineering Okaloosa County Water & Sewer

Weekly Updates

Week ending December 20, 2008

Arbennie WRF

  • Coltin Electrical
    • Performed electrical work for Lord and Sons.
  • RTD
    • Septage Receiving Station
      • Form pad.
    • UV Channel/Effluent Pump Station
      • Idle
    • Centrifuge Roll Off Slab
      • Idle
    • Headworks
      • Install stairs
      • Install Grit Removal Equipment
    • Clarifiers
      • Clarifier # 1- Idle
      • Clarifier # 2- Idle.
    • RAS/WAS Pump Station
      • Form and Pour Walls.
    • Site Civil
      • Pipe testing
  • Pre Con
    • Digester
      • Idle
    • Oxidation Ditch 1
      • Form and Pour Mixer and Aerator Platforms
    • Oxidation Ditch 2
      • Form and Pour Mixer and Aerator Platforms
  • Lord and Sons
    • Maintenance Bldg
      • Pulled wire
      • Install windows, roof trim, and drywall
    • Administration Bldg
      • Pulled wire
      • Install windows, roof trim, and drywall
    • Electrical Building No 1
      • Install Roof Trim
      • Install electrical equipment and HVAC
    • Electrical Building No 2
      • Install Roof Trim
      • Install Electrical Equipment
  • CDM
    • Weekly Progress Meeting.
    • Subcontractor Coordination.

RIBS

  • OCWS Construction Crews
    • RIBS complete.

Garniers Re-pump Station

  • Speegle Construction
    • Continued yard piping and compaction testing
    • Paint inside of plug valves
    • Grout in pump and motors
    • Install Interior and Exterior Lighting
    • Pour pad for main disconnect outside building.

OCWS Collection and Transmissions System Improvements

  • EA Services
    • Stopped 2-20" lines at Garniers in order for the OCWS Crews to cut in TEE
    • Place 2-20" Line stops on Roberts Road Section of Influent Pipe
    • Placed 1-16" tap at Garniers
    • Placed 2-20" Taps at Garniers
    • Stopped2-20" lines at Roberts Road.
    • Install and test tap on 20" line at Garniers