Arbennie WRF
- Coltin Electrical
- Performed electrical work for Lord and Sons.
- RTD
- Septage Receiving Station
- Form and pour curb. install Equipment
- UV Channel/Effluent Pump Station
- Centrifuge Roll Off Slab
- Headworks
- Install Slide Gates, Grating and Mechanical Bar Screens.
- Form and Pour remainder of grit walls and beams.
- Clarifiers
- Clarifier # 1- Idle
- Clarifier # 2- Idle.
- RAS/WAS Pump Station
- Site Civil
- Pre Con
- Digester
- Oxidation Ditch 1
- Form and Pour Center Walkways
- Oxidation Ditch 2
- Form and Pour Center Walkways
- Lord and Sons
- Maintenance Bldg
- Drywall complete
- Installed Roll-up Doors
- Begin Tile Work
- Administration Bldg
- Installed Electrical Equipment
- Completed Roof Trim
- Installed Gutters
- Tape Drywall
- Electrical Building
No 1
- Install Gutters and Downspouts
- Install electrical equipment and HVAC
- Electrical Building No 2
- Install Electrical Equipment
- Install Gutters and Down Spouts.
- CDM
- Weekly Progress Meeting.
- Subcontractor Coordination.
RIBS
Garniers Re-pump Station
- Speegle Construction
- Pour Pipe Pedestals
- Pour Building entrance pad and by-pass pad.
- Set doors and frames.
- Set roll door.
- Continue site work including retention ponds and grating
- Electrical-Terminating connections with VFDs, louvers, dampers and generator.
OCWS Collection and Transmissions System Improvements