Arbennie WRF
- Septage Receiving Station
- UV Channel/Effluent Pump Station
- Form and our jib crane foundation and pad.
- Install slide gates and reuse water pumps.
- Install troughs.
- Centrifuge Roll Off Slab
- set centrifuge and install piping
- Headworks
- Grout slide gates
- Install grating, grit pumps, and piping.
- Clarifiers
- Clarifier #1 - Idle.
- Clarifier #2 - Idle.
- RAS/WAS Pump Station
- Form and pour center walls and pump pads.
- Site Civil
- Install RAS/WAS piping to pump pads.
- Digester
- Oxidation Ditch 1
- Form and pour south walkways.
- Set control gates, mixers, and aerators.
- Oxidation Ditch 2
- Form and pour south walkways.
- Set control gates, mixers, and aerators.
- Maintenance Bldg
- Pull and terminate wire.
- Install tile, ceiling grid, downspouts, and canopy.
- Administration Bldg
- Pull and terminate wire.
- Install tile, ceiling grid, downspouts, and HVAC equipment.
- Electrical Building
No 1
- Electrical Building No 2
CDM
- Weekly Progress Meeting.
- Subcontractor Coordination.
RIBS
Garniers Re-pump Station
- Speegle Construction
- Grout bases of pipe supports.
- Install steel grating.
- Set doors/frames and hardware.
- Continue site work including retention ponds, grading, and chain link fence.
- Electrical - Install fire alarm. Terminate connections with VFD's/Louver/Dampers.
OCWS Collection and Transmissions System Improvements
- OCWS continues inter connect piping at the Garniers WWTP