Arbennie Pritchett Water Reclamation Facility Arbennie Pritchett Water Reclamation Facility Program, Okaloosa County Water and Sewer Department Okaloosa County and Constantine Engineering
Constantine Engineering Okaloosa County Water & Sewer

Weekly Updates

Week ending February 7, 2009

Arbennie WRF

  • Septage Receiving Station
    • Idle
  • UV Channel/Effluent Pump Station
    • Install reuse and effluent pumps and piping.
  • Centrifuge Roll Off Slab
    • Scarify roll off pad. Form and pour stair landing. Install stairs and handrails.
  • Headworks
    • Point and patch concrete. Install grit equipment and piping.
  • Clarifiers
    • Clarifier #1 - Idle.
    • Clarifier #2 - Idle.
  • RAS/WAS Pump Station
    • Form and pour pump pads and slab.
  • Site Civil
    • Install RAS/WAS piping to pump pads.
  • Digester
    • Install piping to rotary drum thickener and sludge feed pumps.
  • Oxidation Ditch 1 & 2
    • Clean out tanks. Install aerators.
  • Maintenance Bldg
    • Install lights and HVAC equipment.
  • Administration Bldg
    • Pull and terminate wire.
    • Hang interior doors.
    • Install lights, ceramic tile, and HVAC equipment.
  • Electrical Building No 1
    • Terminate cable.
    • Install ceiling grid.
    • Install chemical skids.
  • Electrical Building No 2
    • Terminate cable
    • Install ceiling grid .
  • CDM
    • Weekly Progress Meeting.
    • Subcontractor Coordination.
  • RIBS

    • OCWS Construction Crews
      • RIBS complete.

    Garniers Re-pump Station

    • Speegle Construction
      • Electrical: Install surge suppression.
      • Install main entrance gate.
      • Construct canopy for false door.

    OCWS Collection and Transmissions System Improvements

    • OCWS continues inter connect piping at the Garniers WWTP

    « Previous week's update

    « Return to Weekly Update Index

     