Arbennie WRF

  • Septage Receiving Station
    • Panel wiring continues.
  • UV Channel/Effluent Pump Station
    • Install panels and miscellaneous metals.
  • Centrifuge and Roll Off Slab
    • Canopy installation continues.
  • Headworks
    • Point and patch concrete.
    • Miscellaneous metals installation continues.
  • Clarifiers
    • Clarifier #1 - Grout Repair Underway.
    • Clarifier #2 - Grout Repair Underway.
  • RAS/WAS Pump Station
    • RAS/WAS pumps and piping is complete. Pouring of the pump slabs continues.
  • Site Civil
    • Install effluent and reuse piping.
    • Install scum piping.
  • Digester
    • Install piping to rotary drum thickener and sludge feed pumps.
  • Aeration Basins 1 & 2
    • Walkway and handrail installation continues .
  • Maintenance Building
    • Install HVAC equipment, ceramic tile, and toilet accessories.
    • Paint canopy steel.
  • Administration Building
    • Install ceramic tile, HVAC equipment, EIFS, toilet accessories and folding partition.
    • Continue painting.
  • Electrical Building No 1
    • Terminate wire.
    • Install chemical skids.
  • Electrical Building No 2
    • Terminate wire.
  • CDM
    • Weekly Progress Meeting
    • Subcontractor Coordination
  • RIBS

    • OCWS Construction Crews
      • RIBS complete.

    Garniers Re-pump Station

    • Speegle Construction
      • Pump Station is currently operational.

    OCWS Collection and Transmissions System Improvements

    • OCWS continues inter connect piping to the Arbennie Pritchett WRF.