Arbennie Pritchett Water Reclamation Facility Arbennie Pritchett Water Reclamation Facility Program, Okaloosa County Water and Sewer Department Okaloosa County and Constantine Engineering
Constantine Engineering Okaloosa County Water & Sewer

Weekly Updates

Week ending March 21, 2009

Arbennie WRF

  • Septage Receiving Station
    • Complete
  • UV Channel/Effluent Pump Station
    • Install jib crane.
  • Centrifuge and Roll Off Slab
    • Install conduit .
    • Install stairs and handrails.
    • Install overhead crane.
  • Headworks
    • Channel coating continues.
    • Electrical installation is ongoing.
  • Clarifiers
    • Clarifier #1 - grout floor
    • Clarifier #2 - grout floor
  • RAS/WAS Pump Station
    • Install miscellaneous metals.
  • Site Civil
    • Pipe testing continues.
  • Digester
    • Install piping to rotary drum thickener, centrifuge, and sludge feed pumps.
  • Aeration Basins 1 & 2
    • Walkway and handrail installation continues.
    • Electrical insallation continues.
  • Maintenance Building
    • Install overhead crane.
  • Administration Building
    • Install plumbing fixtures and millwork.
    • Install cabinets.
  • Electrical Building No 1
    • Terminate wire.
  • Electrical Building No 2
    • Terminate wire.
  • CDM
    • Weekly Progress Meeting
    • Subcontractor Coordination
  • RIBS

    • OCWS Construction Crews
      • RIBS complete.

    Garniers Re-pump Station

    • Speegle Construction
      • Pump Station is currently operational .

    OCWS Collection and Transmissions System Improvements

    • OCWS continues inter connect piping to the Arbennie Pritchett WRF.

    « Previous week's update

    « Return to Weekly Update Index

    © Copyright All Rights Reserved. Privacy Policy | Terms of Use | Site Map |
    WEB Site Maintained by The Constantine Group